North Bay's Canada Place waterfront project delayed
North Bay's Canada Place waterfront project delayed
A disappointed Hariett Madigan walked along the North Bay waterfront at the future site of Canada Place.
The project will include a new walkway, seating and gardens meant to recognize diversity and inclusion.
"With new people in our community, and immigrants and all the citizens of the city and all of it visitors, we wanted to have a special gathering place," said Madigan who is the co-chair of the North Bay Heritage Gardeners.
The Heritage Gardeners are spearheading the Canada Place project, which has been in the works since 2017 in honour of the country's 150th anniversary.
The project is being delayed due to product availability, and labour costs which has doubled the original $120,000 price tag.
The heritage gardeners went to tender for spring 2022 construction only to find costs inflated.
"You have to go with the climate as I say and go with the flow," said Madigan. "But we're determined to have the project finished."
North Bay Heritage Gardeners Canada Place
The federal government previously committed $50,000 for Canada Place.
Nipissing-Timiskaming MP Anthony Rota expressed his disappointment with the project's delay Saturday.
"I just encourage the volunteers and the people working on it to keep going and not to give up because it's a beautiful project that will benefit the waterfront and benefit all people of North Bay," Rota said.
The request for additional funds to make up the shortfall will be presented to city council for the 2023 fiscal budget. This will create another year delay in completing the project.
"This is your place to meet with your family. This is a jewel of our community right here and Canada Place will be another jewel," said Madigan.
Responsibility for the project will he turned over to the city... but the Heritage Gardeners will retain responsibility for walkway brick sale, purchase, and engraving.
CTVNews.ca Top Stories
Poilievre preferred among Conservatives, but Charest favoured by Canadians: poll
Ontario MP Pierre Poilievre remains the heavy favourite to be the next Conservative party leader but he trails opponent Jean Charest for support among Canadians as a whole.

Amber Alert for two Sask. children extended into South Dakota
An Amber Alert issued on Monday for two Saskatchewan children has been extended into South Dakota. Saskatchewan RCMP say evidence uncovered during their investigation suggests the children may be in the U.S. state.
Ontario nurse facing charges after alleged assault that left 2-year-old in hospital
An Ontario nurse is facing charges in connection with the alleged assault of a two-year-old boy with “significant medical limitations” in Niagara Region.
How one Canadian family of five is coping with the highest inflation in years
With inflation rising at its fastest pace in nearly 40 years, the cost of everything from food to gas has skyrocketed. Canadians across the country are feeling squeezed, but big families with multiple children are at times shouldering much of the higher costs — and changing demographics and consumer patterns have left some of them more exposed to inflation than in previous generations.
EXCLUSIVE | 'Train surfer' under police investigation speaks about his dangerous adventures
The man who claims to be one of the people seen 'surfing' on the roof of a moving subway train in Toronto is speaking exclusively to CTV News about his stunts and the looming threat of a police arrest.
Exposure to synthetic 'forever chemical' linked to liver cancer, study finds
Exposure to synthetic ‘forever chemicals’ often polluting the environment has been linked to the most common type of liver cancer, according to a recent study.
2,300-year-old Chinese chemistry formula deciphered after analyzing ancient coins
The ingredients in a 2,300-year-old ancient Chinese chemistry formula have finally been identified, revealing new secrets about metallurgy in ancient China.
Heavier flow, breakthrough bleeding reported among some individuals after COVID-19 vaccine: study
A new study found that people with regular menstruation cycles and those who typically do not menstruate either experienced a heavier flow or breakthrough bleeding after being vaccinated against COVID-19.
Saskatoon woman made checklist while planning abduction, court documents allege
A Saskatoon mother made an apparent 'checklist' while planning to vanish with her son, according to court documents